- Air-gapped
- An air-gapped system has no network connection to the internet or to any outside network, so data can only move in or out through physical media or a person.
- AS9100
- AS9100 is the quality management system standard for aviation, space, and defense organizations, built on ISO 9001 with additional industry-specific requirements.
- AS9102
- AS9102 is the aerospace standard that defines the requirements and standard forms for first article inspection, used across the aviation, space, and defense supply chain.
- Bar stock and drops
- Bar stock is material bought in standard lengths of round, square, or hex bar, and a drop is the leftover piece after the parts have been cut from it.
- CAPA (corrective and preventive action)
- CAPA is the process of finding the root cause of a problem, fixing it so it doesn't recur (corrective action), and addressing potential problems before they happen (preventive action).
- Certificate of conformance (CoC)
- A certificate of conformance is a signed statement from a supplier that the parts shipped meet the requirements of the purchase order and drawing.
- CMMC
- CMMC, the Cybersecurity Maturity Model Certification, is the Department of Defense program that verifies contractors protect Federal Contract Information and Controlled Unclassified Information to a required level.
- CUI (Controlled Unclassified Information)
- CUI, or Controlled Unclassified Information, is government information that isn't classified but still has to be safeguarded and shared only under controls set by law, regulation, or policy.
- DFARS 252.204-7012
- DFARS 252.204-7012 is the Defense Department contract clause that requires contractors handling covered defense information to protect it with NIST SP 800-171 controls and to report cyber incidents.
- DFARS specialty metals
- The DFARS specialty metals clause requires that certain metals in items delivered to the Department of Defense be melted or produced in the United States or a qualifying country, with limited exceptions.
- External service provider (ESP)
- In CMMC scoping, an external service provider is an outside company that runs IT or security services for a contractor and stores, processes, or transmits its CUI or security data in doing so.
- FedRAMP Moderate equivalency
- FedRAMP Moderate equivalency is the DoD requirement that any cloud service storing covered defense information meet the FedRAMP Moderate baseline, proven by a third-party assessment.
- First article inspection (FAI)
- First article inspection is a complete, documented verification that the first part produced by a new or changed process meets every requirement on the drawing and purchase order.
- ISO 9001
- ISO 9001 is the international standard for quality management systems, setting requirements a company must meet to show it consistently delivers products that meet customer and regulatory requirements.
- ITAR
- ITAR, the International Traffic in Arms Regulations, are US State Department rules controlling the export of defense articles, defense services, and related technical data listed on the US Munitions List.
- Job costing
- Job costing is tracking the actual labor, material, and outside processing costs of each individual job and comparing them to what was quoted.
- Job traveler (router)
- A job traveler, also called a router or shop traveler, is the document that moves with a job through the shop, listing every operation, the material, and where each step gets signed off.
- Material certs / mill test report (MTR)
- A mill test report, often called a material cert, is the document from the mill or supplier certifying a material's heat or lot, chemical composition, mechanical properties, and the specification it meets.
- NCR (non-conformance report) and MRB
- A non-conformance report documents a product or process that doesn't meet requirements, what was found, how it was dispositioned, and what was done about it.
- NIST SP 800-171
- NIST SP 800-171 is the federal standard that sets the security requirements for protecting Controlled Unclassified Information on contractor systems.
- OTD (on-time delivery)
- On-time delivery is the percentage of orders or line items shipped by the date promised to the customer.
- Perpetual license
- A perpetual license is a one-time purchase that lets you use a version of software indefinitely, usually with an optional annual fee for updates and support.
- PPAP (Production Part Approval Process)
- PPAP is the automotive industry's process, defined by AIAG, for a supplier to prove to a customer that its production process consistently makes parts meeting all requirements.
- Quantity breaks
- Quantity breaks are the set of quantities on a quote, such as 25, 50, and 100, each with its own unit price reflecting setup spread over more parts and any volume material savings.
- Routing
- A routing is the ordered list of operations needed to make a part, with the work center, setup time, and run time for each step.
- Setup time vs cycle time
- Setup time is the one-time effort to get a machine ready to run a job, and cycle time is the time to make each part once the setup is done.
- Shop rate / burden rate
- A shop rate is the hourly rate a shop charges or costs for machine and labor time, and the burden rate is the overhead portion of that rate that covers costs beyond direct wages.
- SPRS score
- SPRS, the Supplier Performance Risk System, is the DoD database where contractors post their NIST SP 800-171 self-assessment score, which primes and contracting officers can check.
- WIP (work in process)
- WIP, or work in process, is every job that has been released to the shop but isn't finished yet, along with the material and labor already invested in it.
- Work order
- A work order is the internal authorization to make a specific quantity of a part, usually created when a customer PO arrives, that ties together the routing, material, due date, and costs for that run.