Setup time vs cycle time
Setup time is the one-time effort to get a machine ready to run a job, and cycle time is the time to make each part once the setup is done.
Setup covers loading the program, fixturing, touching off tools, and proving out the first part. It happens once per job (or per op), regardless of quantity. Cycle time, also called run time, is the per-piece time from start to finish of the machining cycle, often with load and unload included in what shops quote as run time.
The difference drives pricing. On a quantity of five, setup can be most of the cost. On a quantity of five thousand, cycle time dominates and shaving seconds matters. Quoting both separately is what makes quantity breaks work, because setup gets divided across more parts as the quantity rises.
In Traveler, each routing op carries a setup time and a run time. Quotes amortize setup across each quantity break automatically, and floor scans capture actual time on each op so the next quote of the part can use real numbers.
Related
Want this handled without the spreadsheet?
Traveler Cloud is quote-to-invoice for small machine shops at $109/month flat, unlimited users. It's in early access — leave your email and we'll bring you in by wave. No sales calls.
Free, no signup: Bar Stock Calculator →